Severity: Notice
Message: Undefined index: HTTP_ACCEPT_LANGUAGE
Filename: controllers/Proyecto.php
Line Number: 50
Backtrace:
File: C:\inetpub\wwwroot\EspectraWeb\application\controllers\Proyecto.php
Line: 50
Function: _error_handler
File: C:\inetpub\wwwroot\EspectraWeb\index.php
Line: 661
Function: require_once
INNSIDE by Meliá Calviá Beach
Project management of hotel facilities, ensuring compliance with deadlines, budget and quality standards.

Complete HVAC systems for the entire building.
Fire protection systems.
Guestroom home automation (BMS/domotics).
Smoke extraction systems, including steel duct/piping runs over 20 meters.
Permitting and coordination with the Town Hall/Local Council (administrative procedures and approvals).
Coordination with external utilities and suppliers (e.g., Calvià Water Utility and Iberdrola) for water and power connections, plus related external services.
Oversight of a highly complex transformer substation and the hotel’s sewer/sanitation connections.
Nuestros Trabajos
Reformation of a village house in Biniali Complete renovation of a house in Biniali (village) into a multi-family house.
New construction in progress in ‘Sencelles’ Featuring traditional design and Mediterranean-style finishes.
Palace Reform - Mallorca Major refurbishment of a mansion in the centre of Palma
Penthouse in Palma Old Town Complete penthouse refurbishment in Palma Old Town
New Build Chalet in Marratxí, Mallorca Newly built contemporary house with swimming
Complete refurbishment - Flat Palma-Centre Full optimisation and upgrade
Reforma vivienda "Sa Cabaneta" Reforma integral de vivienda en Sa Cabaneta
PROMOTION - New Building Sa Vinya de Son Verí We are proud to present our new development located in the exclusive residential area of Sa Vinya de Son Verí.